Business partner profile

Mr. Andreas Kasper

Education: mechanical engineer

Degree: Diplom-Ingenieur ( FH )

Foreign lenguages: English / basic knowledge
French / basic knowledge
Russian / good

Technical focus: mechanical design, concept planning for assembly lines, project management and assembly support for special machines devices, assembly-, testing- and measuring stations , KVP, Ramp up
e.g..: mechanical engineering / special machine construction / plant construction / aircraft construction / automobile assembly / automotive

Expertise

Working fieldes/areas of expertise: Design
Tenders
tender evaluation
construction
project management
Task Force leadership in the ramp up mgmt

CAx-Tools: AUTOCAD

Construction know-how: construction of special machines
Construction of gear assembly lines
Construction engines (diesel, petrol) assembly lines
Common Rail Technology (pump, nozzle) assembly lines
forge devices design

Work areas: Automation Technology
CAD
electronics
production technology
Special mechanical engineering
process technology


Industries: Industries: Plant
Automotive Industry
Automotive
aircraft
service
Electrical industry
Industry
mechanical engineering
chemical industry
media


05-2019 – dato  bs Automatisierung GmbH - Rosenfeld

Project Work:  Interim construction management with the conceptual preliminary planning, construction management of the MA in the construction of various automation cells, concept planning, preparation of the assembly concepts and functional specifications
Automation, automotive, automotive industry


10-2014 – 05-2019  MAHLEBehr GmbH & Co KG, Stuttgart Feuerbach

Project Work:  Concept planning and tendering for a production line for roof blowers and conceptual pre-planning of a fully automated work element line, concept planning, preparation, preparation of assembly concepts and specifications
Climate and thermal management in the automotive industry


10-2014 - 05-2019  MAHLEBehr GmbH & Co KG, Stuttgart Feuerbach

Project Work:  Concept planning and tendering for a production line for battery cooling plates and the associated common rail
Contract extension over the period of preliminary planning, concept planning, preparation, preparation of a prototype production
Electric vehicles division automotive industry


10-2014 - 05-2019  MAHLEBehr GmbH & Co KG, Stuttgart Feuerbach

Project Work:  Concept planning and tendering for an assembly line for an aroma unit for air improvement in the car
Contract extension over the period of award to delivery of the assembly line as overall project manager
Air conditioning units in the automotive industry


10-2014 - 05-2019  MAHLEBehr GmbH & Co KG, Stuttgart Feuerbach

Project Work: Concept planning and tendering for a fully automatic assembly line for air conditioning fans, including automatic balancing
Contract extension over the period of award to delivery of the assembly line as overall project manager
Air conditioning units in the automotive industry

06-2015 – 09-2015  Robert Bosch AS plant Bremen


Project Work:  Member of the task force for the optimization of the flex-line for steering columns Audi and Jaguar - Land Rover
Vulnerability analysis, Pareto fault analysis, optimization of processes and station processes
Automotive area


10 2014 – 06-2015  Daimler AG, gearbox assembly plant Hedelfingen

Project Work:  Member of the task force for the optimization of the automated transmission assembly line
Vulnerability analysis, Pareto fault analysis, optimization of processes and station processes
Gearbox assembly in the automotive industry


04-2013 – 10-2014 Daimler AG – plant Sindelfingen

Project Work: Concept planning + specification for 4 automatic stations, bodywork Interior fittings for installing roof reinforcement and damping mats, for installing the multi-function recess on two lines each for new series with a wide range of variants
Offer evaluation, technical pre-negotiation, project management over the entire term with all topics, supplier support, design approvals, shipping approvals, approvals, final approvals, proof of ability, availability, cycle times
Vehicle assembly with adhesive cells in the automotive industry


02-2014 – 11-2014 Ferdinand Porsche AG

Project Work: Advice on the implementation of an adhesive cell for trunk recesses in terms of feasibility, cycle time, and technical. Execution, degree of automation, emergency concept
Body construction in the automotive industry


08-2013 – 04-2014 MDC Power GmbH plant Kölleda (Daimler AG)

Project Work: Development and evaluation of emergency strategies for assembly processes within the cylinder head production
Cylinder head machining in the automotive industry

02-2013 – 11-2013 VW AG – plant Salzgitter Engine assembly

Project Work: Participation in the planning team for a 4-cylinder in-line engine assembly line
Advice on design execution of mechanics
Design approvals and main areas of focus
Motors assembly automotive industry


09-2011 – 08-2014 MDC technology GmbH plant Arnstadt (Daimler AG)

Project Work: Participation in the planning team of a new factory for LDS coatings for crankcases
Advice on design execution of mechanics
Design approvals and main areas of focus
Motors cylinder coating automotive industry


01-2013 – 03-2013 Dürr Consulting for Daimler ML/IB-ToC

Project Work: Concept planning MRA II assembly line bodywork interior “Mech block”
Concept letters for DVD, MFM, discs, ASD
Station description for Spec
Assistance in creating a "best practice process"
IB automotive industry


06-2012 – 12-2012 Daimler AG – plant S-UT – PPA/M

Project Work: Concept planning of an in-line engine assembly line as agile
Production system for 4 and 6 cylinders, petrol and diesel engines
Station description for specification creation
Assistance in creating a "best practice catalog"
Engine assembly area 4/6 cylinder automotive industry

09-2011 – 12-2012 MDC Power GmbH plant Kölleda (Daimler AG)

Project Work: Start-up of the petrol engine assembly line
Vulnerability and fault evaluations
Measures to increase availability
Preparation of the line for two-shift operation
Engine assembly area automotive industry

02-2013 – 11-2013 VW AG – Salzgitter Motorenmontage

Tätigkeiten im Projekt: Mitarbeit im Planungsteam für eine Montagelinie 4 Zylinder Reihenmotor
Beratung Konstruktionsausführung Mechanik
Konstruktionsfreigaben und IH Schwerpunkte
 Bereich Motoren Montage Automobilindustrie

09-2011 – 08-2014 MDC technology GmbH Arnstadt (Daimler AG)

Tätigkeiten im Projekt: Mitarbeit im Planungsteam einer neuen Fabrik für LDS-Beschichtungen von Kurbelgehäusen
Beratung Konstruktionsausführung Mechanik
Konstruktionsfreigaben und IH Schwerpunkte
 Bereich Motoren Zylinderbeschichtung Automobilindustrie

01-2013 – 03-2013 Dürr Consulting for Daimler ML/IB-ToC

Tätigkeiten im Projekt: Konzeptplanung MRA II Montagelinie Karossen Innenausbau Mech-Block
Konzeptbriefe für DVD, MFM, Scheiben, ASD
Stationsbeschreibung zur Spec 
Mithilfe bei der Erstellung eines „best practice process“
 Bereich IB Automobilindustrie

06-2012 – 12-2012 Daimler AG – S-UT – PPA/M

Tätigkeiten im Projekt: Konzeptplanung einer Reihenmotormontagelinie als agiles
Produktionssystem für 4 und 6 Zylinder, Benzin und Dieselmotoren
Stationsbeschreibung zur LH Erstellung 
Mithilfe bei der Erstellung eines „best practice Katalog“
 Bereich Motorenmontage 4/6 Zylinder Automobilindustrie

09-2011 – 12-2012 MDC Power GmbH Kölleda (Daimler AG)

Tätigkeiten im Projekt: Hochlauf der Benzin Motorenmontagelinie
Schwachstellen- und Störungsauswertungen
Maßnahmen zur Verfügbarkeitssteigerung
Vorbereitung der Linie auf den Zweischichtbetrieb
 Bereich Motorenmontage  Automobilindustrie

08-2011 – 12-2012 Daimler AG plant Sindelfingen

Project Work: Project management for the conversion of the assembly line for a new vehicle type X218
Conversion support for 6 plants with coordination of the suppliers, execution of inspections and controls of the LOP
Support and support for ramp-up with optimization
Vehicle interior fitting area, automotive industry


01-2011 – 03-2012 FTE Automotiv GmbH – plant Ebern

Project Work: Concept planning of two assembly lines incl. End of line test with creation of the specifications, tender documents with supplier evaluation including all preparation such as type support, FMEA and PFMEA
Dual clutch transmission division automotive supplier


04-2008 – 03-2011 MDC Power GmbH engine plant Kölleda Daimler AG

Project Work: Coordinating the establishment of external maintenance
start-up management for engine assembly lines (diesel + petrol), agreements with customers and suppliers from design approval to commissioning and acceptance of the complete equipment, such as:
Engine entrance warehouse with administration and control
EMS with three assembly lines and linked assembly line
Engine test benches with leak, acoustic, cold, hot
Dispatch warehouse with administration and control and truck picking (JIG + JIS)
Engine assembly area automotive industry


01-2008 – 04-2008 DeWind GmbH plant Lübeck

Project Work: Research into the causes of existing gearbox damage, agreements with suppliers and laboratories, classification of the damage, inspection with risk assessment, development of repair concepts, development of time frames for the repair process and created one new standard for black barring’s
Wind Turbine (WEA) division - large gear units

11-2007 – 12-2007 MDC Power GmbH engine plant Kölleda Daimler AG

Project Work: Development of a specification for the tender for the complete maintenance service of the diesel engine plant in Kölleda for Daimler - Chrysler + Mitsubishi
Cooperation in the concept and execution of the new assembly hall along with complete equipment, such as:
Engine entrance warehouse with administration and control
EMS with three assembly lines
Diesel engine test field with leak, acoustic, cold, hot
Shipping warehouse with administration and control and truck picking
Diesel engine assembly in the automotive industry

04-2006 – 10-2007 Airbus Germany - plant Stade

Project Work: Project management, agreements with AG and AN, supervision of commissioning and start-up of the Flow Assembly Line VTP-SA, installation supervision, implementation of approvals,
Actual recording of the open points, administration and scheduling of processing, Concept development of a new assembly line, project management, elaboration of the specification, offer evaluation, purchase negotiation
Construction discussions and approvals of the AG, scheduling and controlling, agreements with process and quality, plant planning about execution, logistics, process and dates, controlling and project support, cooperation with the departments, preparation of presentation documents,
Execution and controlling of experiments and their evaluation, reporting to AG
Aircraft construction

08-2005 – 03-2006 GM Powertrain Austria – Vienna gearbox assembly

Project Work: Head of a task force, ramp-up manager to lead an assembly line for 6-speed gearboxes for diesel engines to the up time and quality, work ergonomics and process design, FiFo, EPV (single process regulations), AEB (work element sheets), SAB (Control and worksheet), test plans, maximum output of 130 gears / h was exceeded in a shift with 137 gears / h in March.
Management support in the establishment of a new management structure, agreements with customers and suppliers, ideas for optimizing individual stations
Gearbox manufacturing and assembly in the automotive industry

04-2005 – 08-2005 Freudenberg Spezialdichtungen Reichelsheim

Project Work: Actual recording of the various production cells for rubberized drive wheels (GAR)
Development of a new manufacturing concept for GAR
elaborate a specification, tender and offer evaluation
Production beyond 2012
Recording and re-planning of manufacturing options for various products in the automotive industry, such as: sealing plate, sealing cover, injector component (vane pumps), flap seal, evaluation of supplier offers, implementation of supplier agreements
Elastomer 

Option: on extending the commissioning and ramp-up management of the new special facilities
Elastomer division


01-2005 – 03-2005 Industry (from my office - follow-up projects)

Project Work: Documentation updates and revisions
various constructions from my office were re-ordered by the end customer with occasional modifications for new component geometries. The existing data was then changed and adjusted, and a new drawing document created.


03-2004 – 12-2004 Robert Bosch GmbH - ATMO Feuerbach

Project Work: Extension of the order, extension of the projects to new products and new assembly lines, new high pressure pump for diesel engines
Start-up management of assembly lines
Common rail - automotive division


03-2004 – 12-2004 Robert Bosch GmbH - ATMO Feuerbach

Project Work: Special machine builders from Bosch for Bosch, project management, preparation and planning of assembly lines, designing the degree of automation for various locations worldwide, design and assembly support, technology and deadline monitoring, on-site assembly, acceptance tests and ramp-up support.
Common rail - automotive division

01-2004 – 02-2004 GM-Powertrain / Automotive industry gearbox

Project Work: Extension of the task force order, ramp-up was achieved in the period up to December 03, the new task was to stabilize this performance of the line in up-time and quality, the start of the activity was a production of <40% capacity, last week of February the average for 370 of 330 gearboxes designed (> 112%) line output per shift, an option for a further line start-up in Austria was agreed.
Gearbox manufacturing and assembly area for diesel engines in the automotive industry


2003 GM Powertrain / Automotive industry gearbox

Project Work: Head of a task force, start-up management, to lead an assembly line for 6-speed transmissions to the up time and quality, work ergonomics and process design, FiFo, EPV, AEB, SAB, test plans.
Gearbox manufacturing and assembly area


 B&H special machine

Project Work: Assembly sites for the manufacture of mirror adjusters Opel construction, detailing and advice on the execution of the individual assembly sites in technology and QA

 Arau Automation

Project Work: Measuring device for plug connector assembly with 600 pin / min, compl. Construction, detailing and documentation of installation supervision

 B&H special machine / Stahl

Project Work: Assembly and press equipment for switches complete construction, assembly support, and acceptance


2002 Industry

Project Work: Linking and assembly petrol engine DC M272 and M273, mech. Processing of housing and cover: blower and suction station, bunker cycle belt detailing and documentation + project agreements with suppliers.

 Industry gearbox assembly

Project Work: Assembly line Getrag 5 types of gearbox design part adapters, swivel units, press fitting, measuring station.
Detailing and documentation of the facilities

Project support up to trial run and test production
automotive gearbox assembly

Project Work: Manual workstations ZF for mounting clutch housings VW and BMW
design + Project support + testing and acceptance

 Industry

Project Work: Assembly line of the control unit hydromatics
Design + project support until acceptance

2001 Automotive

Project Work: Air spring assembly line Maybach
complete Design + project support until acceptance

 Industry

Project Work: Crack tester for bearing rings up to 2000 mm
Design + project support until acceptance

 Automotive

Project Work: Diesel engines assembly VW, screw the oil pan completely Design + project support until acceptance

 Automotive gearbox assembly

Project Work: Manual assembly stations ZF gearbox VW and BMW. Design + construction supervision + testing + acceptance

 Automotive

Project Work: Air spring assembly line VW-D1 + D3
Design + detailing + documentation + construction supervision + trial run + acceptance, project support including control

2000 Automotive

Project Work: Screwdriver portal with NW turn BMW diesel engine assembly mech. Design + construction supervision and commissioning

 Automotive gearbox assembly

Project Work: Project planning for gearbox production ZF arrangements and layout

 Industry

Project Work: Assembly line air spring USA mech. Design + process flow for control + assembly support + test run and acceptance

 Automotive

Project Work: Modification of engine assembly line Audi Györ, 2-fold and 8-fold screw-in module
sealing press station, NW turn, west support mech. Design + construction supervision

 Special Knowledge

Project Work: Development of process flows
Control specifications
Project monitoring of all internal and external services
Inquiries, agreements and acceptance of external services
Test run with acceptance tests up to system handover with worker instruction
Run-up management task force management
Production technology, process engineering, precision engineering, automation technology
Planning / conception / development / design
Construction (overall / part construction)
Project management / project management
Introduction of CAD systems or similar SW
Control / monitoring / commissioning


curriculum vitae

 Personal data

Name, Forename: Kasper, Andreas

Date of birth: 30.05.1962

Place of birth: Weimar

Nationality: Germany

Marital Status: married

children: 1 Son 

school career

09/1968 - 07/1976 Pestalozzi-Oberschule Weimar

 Hauptschulabschluss

09/1976 - 07/1978 Goethe-Oberschule Weimar

 Realschulabschluss mit FH - Reife

vocational training

09/1978 - 02/1981 Betriebsberufsschule Weimar Werk

 Facharbeiter f. Fertigungsmittel (toolmaker)

05/1981 - 04/1984 Army

05/1984 - 09/1984 WEIMAR-WERK

 Facharbeiter für Fertigungsmittel im Werkzeugbau - toolmaker

09/1984 - 07/1987 INGENIEURFACHHOCHSCHULE F. MASCHINENBAU LEIPZIG

 Abschluss: Dipl.-Ing. (FH)

Professional background

 

 

 

08/1987 - 12/1989 WEIMAR-WERK

 Design for special machine

 Team leader CAD

 Introduction CAD-tools

 


12/1989 move to Aalen

 

 

 

01/1990 - 05/1990 MASCHINENFABRIK SEYDELMANN

 Designer for united kutter

 Design from special customer adjustments

 


06/1990 - 06/1992 INGENIEURGESELLSCHAFT KIENER mbH

Project management design
Team design from special machine and assembly lines, 
testing and acceptance

 

07/1992 - 03/1993 RICO MASCHINENBAU

 Technical management

Project management and design solution for customer acceptance and production start

 


seit 04/1993 - own design office

Construction of special machines and tools for automotive and
their supplier industry
Die construction for GSA, Schmiedag
Special machine construction for CPT, LSW, SMT, ELWEMA,
Tiede, Alfing - Kessler u. a.

Projects: 

Air spring assembly line VW-D1 + D3, Maybach, Porsche

Engine assembly line (Diesel + Benzin) BMW, VW, Audi, MDC, Porsche

Gearbox assembly line ZF, BMW, VW, Getrag, GM

Crack tester

Assembly flow line VTP (Vertical Tail Plane) air craft

Assembly planning engine Diesel und Benzin

Assembly planning gearboxes

Project management for assembly lines

Task force for ramp up

Optimisation from assembly lines

Cost reduction in the assembly

Andreas Kasper

 


Dewangen, 2020-01-25

empty